Thanks to all who have helped the Association during the year – it has been a relatively quiet year as far as the Board is concerned so this report will be appropriately short and to the point.

 

·         We want to recognize the work of Craig Cowles and Lynn McDonald for the time spent mowing, spraying and for taxiway maintenance contractor supervision as well as the volunteers who have helped with Ditch clean-up this year.

 

·         Thank you as well to Eleanor Cowles and her helpers for the effort on the Ice Cream Social.

 

·         Sincere appreciation for Shirley Horn’s support of the Block Herald Network and to all of the Block Heralds for their dedication to the Airpark.

 

·         Robert English for his support of IAHA as our Webmaster.

 

·         Board members – who contribute time and effort and provide guidance, ideas and feedback as we work through issues for the good of the Airpark.

 

Items of interest to summarize for 2013 are:

 

n       Believe we are all aware of the Federal Legislation providing Congressional guidance and direction to the FAA regarding Residential TTF agreements for airports receiving Federal Grand Funding which was passed and signed in February of 2012.

 

To summarize, that legislation modified FAA statutes by specifying that the existence of a Residential through the Fence (RTTF) agreement was not to be used as grounds for the FAA declaring an Airport owner (in our case the State) out of compliance with Grant Assurances.

 

By way of perspective, the entire text of the legislation regarding RTTF took about 6 column inches on one page in the 3-column format that the Federal Register is printed in.  Following passage, the FAA worked on revising their Administrative Rule which is also known as a “Compliance Guidance Letter” for something around 18 months to arrive at the final version – all 48 or so pages.  That document provides the instructions to FAA Offices as to what is now expected from RTTF agreements.

 

We expect there to be some formal communication from the Oregon Department of Aviation regarding their view of and how they expect to operate under those newly developed guidelines.  That may come in the form of a letter to IAHA or it might be sent directly to our homes – we will know more about that process after the first of the year.

 

One of the things we are aware of is that the FAA’s CGL – and the Federal Law itself – are quite specific regarding the conduct of what could be described as “commercial aeronautical activity” and while our Board has spent some time this past year and the year before, addressing that issue the understanding is that there will be heightened awareness of (and attention to) that issue from both the Federal and State view based on the language in the Statute and the CGL,  For the moment, however about all we know for sure is that there will be more to come in 2014. 

 

n       Taxiway work during 2013 was limited to seal coating the remainder of Skylane (about the eastern 2/3 which wasn’t done last year) and the entire length of Cherokee Taxiway.  There was no crack sealing or other repair required in 2013. 

 

A few of years ago the Board took a longer run look at the potential for resurfacing the Taxiways on a planned basis and whether or not reserves were adequate to sustain an effort aimed at that size of a project.  At the time we determined that it appeared as though the existing program focused on maintenance was working fairly well and there were no apparent signs of impending surface-related issues. 

 

During the preparation for our 2013 maintenance program we were informed that it might be time to look at grinding and resurfacing as a longer-term solution to the coating efforts we’ve been relying on.  For this past year we decided not to begin a resurfacing program and to get better information before any major decisions were considered.  During the coming year we will have to take another look at the potential costs/benefits and funding available if a closer look by engineers does indeed point to needing more aggressive steps for long run preservation.

 

n       Last year it was reported that we had been working with the City and our local City Council member, Forrest Peck, in an effort to make sure the storm drainage system is cleaned out and working properly to avoid the flooding situation experienced two years ago on Mooney Street.  A lot of work has been accomplished in the last 18 months toward that end.  The City has cleaned out the retention pond at the corner of Hoffman Road and Stryker along with cleaning out the blocked lines to the south of that location and repairing or replacing damaged lines discovered in the clean-out process.  They have also lowered the drain opening in the retention pond and doubled the culvert size at Hoffman and Airport road from 12” to 24.”

 

Following an engineering study of the drainage in the vicinity of the Airport additional work has been done to clean out the ditch on the southwest corner of the Airport and also clean out and groom the ditches across Hoffman Road from the SW corner of the Airport.  More work remains to be done on cleaning out the rest of the ditch running to the south into Ash Creek from the north end of the ponds to Ash Creek.  It is expected that the Ash Creek Drainage Board will assist with that effort.

 

The ditch running along Skylane Taxiway to the east is fed from culverts on the west side of the Airport and the study determined that it was presently at capacity to carry water from the Airport property.  There has been a new collection vault installed on the east side of Stryker Road where construction has been underway.  The ditches running north from there and then east have also been cleaned and graded.  This part of the system carries water from the Skylane Ditch and our northern taxiways away from the area and out through rail yard to the east.

 

We also have been told that the ditch carrying water from the North Airpark via the ditch along the RR Tracks and then through private property to the east has been groomed to help the flow away from the area.  There is still work pending on the ditch along the RR Tracks and north of the rail crossing at Stryker to gain the full benefit of cleaning out the private property drainage.

 

n       Finally, the Board has exchanged emails with ODA regarding a couple of items.  The first is that ODA (to comply with State insurance requirements) has asked that they be included as a named insured on our Taxiway Liability Policy.  That policy is new this year. 

 

The second item is that a dialogue has been opened by ODA regarding possible replacement of the traffic control gate at the north end of the restaurant parking lot.  They have an interest in traffic control as does IAHA.  The inability of folks to imderstamd traffic signs and/or close the gate when they go through it has resulted in unauthorized vehicles on our Taxiway property and the ODA is concerned that they could also find themselves on the parallel taxiway or the runway.  At this time, however, both conversations are pending matters which will be addressed during the coming year.

 

 

Thank you for being here and for your support.  Wishing you a “Merry Christmas and a Prosperous New Year !!!

 

Gary Van Horn